top of page

SE Shires
SE Shires - Holliston, MA
Addition to existing 11,000 Square Foot building previously converted by Prime from warehouse to manufacturing.
Construction of a new steel 8,100 SF addition with a ceiling height of 30’
Construction of a soundproof room.
Heating and cooling throughout
Electrical including power distribution and new LED lighting
New fire alarm system
Cable tray and power drops in manufacturing areas
Construction of new locker rooms and showers
Parking lot expansion
New loading dock and overhead doors
Concrete floor polishing and sealing.
Project Gallery
bottom of page